I'm reading where OB orders made after mine (12/26/23) are receiving their build dates now. I'm curious if I ordered something that could cause a delay from me being assigned a build date window? I received the 45 day reconfirmation of my order email, saying they're still working on scheduling and will be back to me in another 45 days... Huh?
Mine is a 2024, O/Banks, 4-door, non-sas, lux, dual top, tow package, steel bumper with brush guard, 4.27 rear end for the locker. Basically everything except the Sasquatch package. Color is eruption green.
Do any of you far more experienced folks see anything in there that could cause it to be delayed?
I spoke to my dealer last week, and they saw only 5 waiting for vin's in their own order banks. Said that was a good sign as it's usually been 5x's that number, but not sure if that speaks more to slower sales than faster manufacturing?
Thanks!!
Mine is a 2024, O/Banks, 4-door, non-sas, lux, dual top, tow package, steel bumper with brush guard, 4.27 rear end for the locker. Basically everything except the Sasquatch package. Color is eruption green.
Do any of you far more experienced folks see anything in there that could cause it to be delayed?
I spoke to my dealer last week, and they saw only 5 waiting for vin's in their own order banks. Said that was a good sign as it's usually been 5x's that number, but not sure if that speaks more to slower sales than faster manufacturing?
Thanks!!