- Thread starter
- #31
Sure I will create and post in your thread when readyHow about a 2/7 template?
Sponsored
Sure I will create and post in your thread when readyHow about a 2/7 template?
Not the entire production for the week just our sample <10%.Wow crazy that each majority piece of the pie is what I have being delivered next week. I know its not necessarily the most popular Bronco configuration, but I'm still surprised to be the majority in each category.
4DR OBX EG 2.7l LUX Softie NON-SAS
This is excellent work! Love seeing everything visually broken down.As many know within the build week threads, a tracking spreadsheet is often (but not always) started to share build information and track production and delivery. This process was started a while back and has been passed along informally ad hoc. There is a wealth of information in these sheets that many may find interesting and answer questions I see here all the time.
I few weeks ago I revised the build week template and re-organized it and added some features like input menus. Shout out to @Firefight911 for adding dashboard graphics that compile the data (under the charts tab). This was done for the 1/17 build group which I am in, and subsequently I have set up the template for 1/24 and 1/31 built week groups.
The purpose of this post is attempt to inform and pull the spreadsheets together in one place so others can see the cool data. Thus I have added links to this newer templates for the recent 3 weeks that I setup below. I request others who have the links to other build weeks to provide those links in a reply here,. Then I will add those inks to this initial thread post. Thus we will have a central place to find this information.
In addition, if there is anyone from the build weeks in February and later want me to create a template like these below for their use, please request here and I will create one for your build week.
1/17 Build week
docs.google.com/spreadsheets/d/1e6jHYF5QgwwkidBe1cfYJxJWcOXm6CaKyKfAkPQYWLQ/edit#gid=0
1/24 Build week
docs.google.com/spreadsheets/d/1r657LD8qnWukOlo1T2ArQ7tn1bp1eGcjXIRKz1pOMRE/edit#gid=0
1/31 Build week
docs.google.com/spreadsheets/d/1PtD1VCgVeyxb3lw04VYJDjqVZXRboHasr8HE9bQiQXc/edit#gid=0
FYI. The data is maintained within the build week threads not here and all by user input.Jan/17
WildTrak
4d
Eruption Green
Tow package
Lux
Heavy-duty modular bumper
I was originally Jan/10 build week but it was changed.
Frustrated Ford didn't let us keep our original orders. Would of been nice.Noooo! This is the only color I want. I love the short bus
Don’t know just reporting the data here all user input. No validation not complete by any means. Just a sample.No Hot Pepper Red?
Thanks. Will do.The 1/10 Build Week is similar and could be added as well:
The post about paint is interesting. The % of cactus gray has dropped in 1/10 build week over time. There have been no noticeable constraint and as people were bumped the graphs balanced builds. It’s been interesting to watch.