- First Name
- Mike
- Joined
- Jan 9, 2023
- Threads
- 2
- Messages
- 339
- Reaction score
- 1,219
- Location
- North Carolina
- Vehicle(s)
- 22 Bronco, 72 Mach, 03 Mach, 69 Mach, 08 Harley
- Your Bronco Model
- Wildtrak
We need photos!!!
Sponsored
I second that!Ouch , 1st one ive heard on the lot ready. Need pictures of changes and so called " improved interior materials "
So hopefully someone can clone the data needed to program the rack and what not for a Badlands, and we can slap that puppy in a 2021.Okay must've been a website issue, I got it to work. It doesn't show a part number for the steering rack, and I wasn't able to cross reference the engineering number.
BUT, it does show it as being built with the Hoss 3.0 inner and outer tie rods. So I would say that's a confirmation.
For those of us waiting on our trucks....when was your truck built (blend date) and where was your truck delivered to? Our antsy folks (me included) will want to to use that data to poorly estimate our deliveries....My dealer just called and said my 24 Badlands SAS is on the lot. Wow that was fast. Has anyone confirmed that the 24s do in fact have the upgraded steering rack?
For those of us waiting on our trucks....when was your truck built (blend date) and where was your truck delivered to? Our antsy folks (me included) will want to to use that data to poorly estimate our deliveries....
My Badlands had a blend date of January 2, it’s still in production just like yours. No updates From Ford or the agent.
This is what the tracker says....
Delivered to Norfolk, VA
So it could be close.My Badlands had a blend date of January 2, it’s still in production just like yours. No updates From Ford or the agent.
I’m just at a loss, how come some vehicles get their status changed to built after a day or two and others stay in production a week laterSo it could be close.
Is dealer allocation still a thing? Maybe they are producing for dealers that have room in their allocation.I’m just at a loss, how come some vehicles get their status changed to built after a day or two and others stay in production a week later
Mine was in production for five weeks back in January 2023. The 4dr they built I didn't actually order was in production for a week. It could be a parts issue that needs replacement. I was just hoping they'd get it right and not take months like some have seen.I’m just at a loss, how come some vehicles get their status changed to built after a day or two and others stay in production a week later
luck of the parts draw or QA.I’m just at a loss, how come some vehicles get their status changed to built after a day or two and others stay in production a week later