- First Name
- Steve
- Joined
- Jul 25, 2021
- Threads
- 3
- Messages
- 10
- Reaction score
- 2
- Location
- New Jersey
- Vehicle(s)
- 2012 Nissan Armada
- Your Bronco Model
- Big Bend
- Thread starter
- #1
I have a 4-door Big Bend, 2.7, Mid package on order (Oct 2021). I am thinking of changing my order to a 2.3 Manual (better mpg plus I prefer driving a stick), and Standard Pkg (fewer chips). How would I make this change--contact the dealer? Does it impact my place in line? Any downsides (besides possible price change since October, but it will still be thousands cheaper than my original build)?
Sponsored