Day 3 reservation. I was originally 3rd week in June build, moved to July 7th and now Ive been told by dealer 8/17 build. 
Badlands, 4 Door, MIC, High, 2.3 manual with tow pkg, roof rack.
Badlands, 4 Door, MIC, High, 2.3 manual with tow pkg, roof rack.
Sponsored