Deleted member 29556
Guest
- Thread starter
- #1
Hello Everyone, I submitted my reservation on 6/25/2021, around 10/15 i was notified it was time to place my order. I waited to at least test drive the vehicle, i was able to test drive a badlands last week with 10 speed 2.3 even though i reserved a manual. I finally placed my order on December 1 and paid the $500 for a 2022 badlands 7 speed lux with hardtop. My question is basically how long would it take for the order to move from order confirmed to scheduled for production? Thank you everyone for your time and your feedback!
Sponsored