- Thread starter
- #1
Kicking this build week off.
Originally a 8/4/23 build week, but was bumped to 8/14.
Two orders, yes two. One was a backup due to being told after the fact the first dealer didn't have a 2 door allocation left.
1st order = 5/30/23 confirmation - build date 8/14/23
2nd order = 6/3/23 confirmation - build date 8/14/23
'23 Black Diamond, 2 door, MIC, SAS, 321A standard equipment, Iconic Silver. Simple, easy to clean, and effective.
Originally a 8/4/23 build week, but was bumped to 8/14.
Two orders, yes two. One was a backup due to being told after the fact the first dealer didn't have a 2 door allocation left.
1st order = 5/30/23 confirmation - build date 8/14/23
2nd order = 6/3/23 confirmation - build date 8/14/23
'23 Black Diamond, 2 door, MIC, SAS, 321A standard equipment, Iconic Silver. Simple, easy to clean, and effective.
Sponsored