- Joined
- Apr 1, 2022
- Threads
- 0
- Messages
- 2
- Reaction score
- 8
- Location
- St. George, UT
- Vehicle(s)
- Honda Civic
- Your Bronco Model
- Black Diamond
Just got bumped for the first time. Ford chat says build date of 5/4, so crossing my fingers.
Sponsored
now bumped to 5/16 arghhhhh!I have been checking weekly on my status and today I was bumped to 5/9.
Margaritas are my love language![]()
Will be on the lookout
Edit:
Bust out the bucking horse piñata! Chat just told me I'm a Cinco de Mayo build day. I expect a margarita if FoMoCo reschedules to any other date.
big bend 4 door velocity blue. Only auxiliary switches. I have everything thing here all ready to put on. Lift, wheels, rock rails, bull bar, etcWho else is a 5/2er?!
What’d everyone get?
UPDATE 4/25 - Well this is a roller coaster! As I stated my date was 4/23. I didn't get a "bumped" email, but checked with chat last week when there was no movement and they said 5/2. I haven't checked the tracker since Saturday, check it tonight, and it has been updated to IN PRODUCTION! Who knows when it will be completed...at least its progress!Bumped here from 4/23 build day…this is my 7th bump from 2/14 original build week.
OuterBanks CG 2.3 Soft Top
Roast Interior
Aux Switches
Very similar story here...see post my 4/23 build day, just changed to "in Production"!Another bittersweet day.
My wife's OBX was slipped from 4/25 to 5/2 Build Week with a 5/5 Build Day. Her seventh and ninth week/day bumps respectively.
My daughter's BB slipped here a few days ago from 4/25. This morning she just had a Build Day of 4/4 - nothing else. Tonight I found out via Chat she is "In-Production."Then found out she has a window sticker with a 5/2 blend date. Tracker updated.
Her build will now happen before my wife's even though wife's was ordered well before my daughters and had an initial build week/day before hers. So great for her since she has been without a vehicle since January.
P.s. Now confirmed some changes can be made to an order after assignment of the VIN. Added rails, LED lights and AUX switches and all were incorporated into her build.
For regular Bronco's they are all built in Wayne, MI. Sports are in MexicoJust a thought, is it a specific plant that is bumping people more than others? I will be built at the Michigan plant. Based on the build week 4/25 comments, a lot of folks don’t have window stickers and have been bumped to the 5/2 build week.
Another bittersweet day.
My wife's OBX was slipped from 4/25 to 5/2 Build Week with a 5/5 Build Day. Her seventh and ninth week/day bumps respectively.
My daughter's BB slipped here a few days ago from 4/25. This morning she just had a Build Day of 4/4 - nothing else. Tonight I found out via Chat she is "In-Production."Then found out she has a window sticker with a 5/2 blend date. Tracker updated.
Her build will now happen before my wife's even though wife's was ordered well before my daughters and had an initial build week/day before hers. So great for her since she has been without a vehicle since January.
P.s. Now confirmed some changes can be made to an order after assignment of the VIN. Added rails, LED lights and AUX switches and all were incorporated into her build.
OH SNAP. Inspired by you fine folks, I too checked tonight and made the leap to In Production. No WS yet. Good luck to all!!UPDATE 4/25 - Well this is a roller coaster! As I stated my date was 4/23. I didn't get a "bumped" email, but checked with chat last week when there was no movement and they said 5/2. I haven't checked the tracker since Saturday, check it tonight, and it has been updated to IN PRODUCTION! Who knows when it will be completed...at least its progress!
I checked in with chat last night and I'm up to 5/3 from 5/6. Congrats on the WS. Hope I'm right behind you.I got my window sticker this morning! Moved up to a Monday 5/2 build date, was previously at Friday 5/6.