Does anyone know if the front license plate holder is installed at the factory or at the dealership?
Sponsored
DealershipDoes anyone know if the front license plate holder is installed at the factory or at the dealership?
I thought so too... But when I called my salesman to give specific instructions to not install the front license plate... He said it comes installed from factory...Dealership
My blend date was 03/03, 82/1783, pizza tracker shows In Production, tear tag is DAA. I chatted with an agent a couple of days ago and they gave me an ETA of 3/24. He said the ETA was the day it would ship. It seems like there are a few of us in the same boat. Not sure if it is a QC issue, a chip issue or something else. I have a pretty vanilla build although I am getting the roof rails, so maybe it's in the Mod Shop. Anyone with roof rails in our group getting shipped??My blend date is 03/03, 84/1783, pizza tracker shows In Production, BCE popped, tear tag is DAA. I just sent an email to my sales at dealer and he said "It shows built waiting on a chip." Am I going to Ice Mountain?![]()
I have a Two door BL with roof rails showing pending convoy shipping with freight number assigned. Dealer reached out to me as well to pass along this info as well. Blend date was 3/3, moved to 3/4. Built on either 3/4, 3/5. Good luck and enjoy the Bronco.My blend date was 03/03, 82/1783, pizza tracker shows In Production, tear tag is DAA. I chatted with an agent a couple of days ago and they gave me an ETA of 3/24. He said the ETA was the day it would ship. It seems like there are a few of us in the same boat. Not sure if it is a QC issue, a chip issue or something else. I have a pretty vanilla build although I am getting the roof rails, so maybe it's in the Mod Shop. Anyone with roof rails in our group getting shipped??
None of the build pics posted here have it...so I have a hard time believing that. My understanding from my salesguy is that its added as part of the prep/packaging at dealership along with those stupid dealer name decals. Im in a state that doesnt require front license plates so dont know if that makes a difference but I dont see them automatically validating states that do require and adding it. imhoI thought so too... But when I called my salesman to give specific instructions to not install the front license plate... He said it comes installed from factory...![]()
My build was also 3/3, actually built on 3/4. 851/1783. My dealer gave me an ETA of 3/26-4/1. I was under the impression that ETA meant Estimated Time of Arrival? not Estimated Ship date??My blend date was 03/03, 82/1783, pizza tracker shows In Production, tear tag is DAA. I chatted with an agent a couple of days ago and they gave me an ETA of 3/24. He said the ETA was the day it would ship. It seems like there are a few of us in the same boat. Not sure if it is a QC issue, a chip issue or something else. I have a pretty vanilla build although I am getting the roof rails, so maybe it's in the Mod Shop. Anyone with roof rails in our group getting shipped??
I have talked to my salesman and Ford customer service trying to get to the bottom of what ETA means when the status is still in production. I went on chat this morning and seems I got lucky in finding an agent who was able to clarify what ETA means and what to really expect.My pizza worked hard for 30+ hours in a row. Now it's taking a break.
Chat told me 3/18, but when I confirmed with my dealer he told me that he saw the expected delivery date to be 3/12-3/18. So, maybe the ETA they're giving us in the chat is the latest expected delivery date.My blend date was 03/03, 82/1783, pizza tracker shows In Production, tear tag is DAA. I chatted with an agent a couple of days ago and they gave me an ETA of 3/24. He said the ETA was the day it would ship. It seems like there are a few of us in the same boat. Not sure if it is a QC issue, a chip issue or something else. I have a pretty vanilla build although I am getting the roof rails, so maybe it's in the Mod Shop. Anyone with roof rails in our group getting shipped??
I'm with you - estimated time of arrival at dealership. Ship dates usually are within days or within a week of your built date.My build was also 3/3, actually built on 3/4. 851/1783. My dealer gave me an ETA of 3/26-4/1. I was under the impression that ETA meant Estimated Time of Arrival? not Estimated Ship date??
My blend date was 3/3, mods popped early 3/4, in production 3/4, four letter/digit tear tag 3/6, and 3/6/22 now on bottom of my WS. 689/1783. 8/18/20 reservation. I am in production with an ETA of 3/31. As I've been told twice by CS, ETA is reportedly the end date for production (which is, as someone commented, a terrible acronym for what it is for). They also said ETA is an estimate and can change. I saw someone had an ETA of 3/11, but shipped yesterday. However, I think what we are really looking for is EDD (Estimated Date of Delivery).My blend date was 03/03, 82/1783, pizza tracker shows In Production, tear tag is DAA. I chatted with an agent a couple of days ago and they gave me an ETA of 3/24. He said the ETA was the day it would ship. It seems like there are a few of us in the same boat. Not sure if it is a QC issue, a chip issue or something else. I have a pretty vanilla build although I am getting the roof rails, so maybe it's in the Mod Shop. Anyone with roof rails in our group getting shipped??
Ok. I am in the exact same boat as you described above - 851/1783. I have no extra options, soft top, BL, 2.7. Only difference: the CS rep I chatted with said my vehicle is "In production with a secondary status of produced". I asked what that meant? is it waiting on part? She replied that it does not show that it is waiting for parts or chips. Gave me an ETA of 4/1. My dealer confirmed that date but talked as if that was the conservative date it would be at the dealership. She also gave me a 1 800 334 4375 number for New Vehicle Customer Support that may be able to give me additional information. Anyone call that number?My blend date was 3/3, mods popped early 3/4, in production 3/4, four letter/digit tear tag 3/6, and 3/6/22 now on bottom of my WS. 689/1783. 8/18/20 reservation. I am in production with an ETA of 3/31. As I've been told twice by CS, ETA is reportedly the end date for production (which is, as someone commented, a terrible acronym for what it is for). They also said ETA is an estimate and can change. I saw someone had an ETA of 3/11, but shipped yesterday. However, I think what we are really looking for is EDD (Estimated Date of Delivery).
Anyway, to answer your question, I do not have roof rails. My only options besides MIC on my BD 7MT 4 door are Keyless Entry and Painted Aluminum Rims. Others still in production, what are your options? Trying to find a common denominator, seeing that many others from our week have been built and shipped already.
The only thing i added onto my build is a roof rack so there could be something there. But also I’m in Northern California so that’s why i thought the eta of April 02 made sense, but hopefully this changesMy blend date was 3/3, mods popped early 3/4, in production 3/4, four letter/digit tear tag 3/6, and 3/6/22 now on bottom of my WS. 689/1783. 8/18/20 reservation. I am in production with an ETA of 3/31. As I've been told twice by CS, ETA is reportedly the end date for production (which is, as someone commented, a terrible acronym for what it is for). They also said ETA is an estimate and can change. I saw someone had an ETA of 3/11, but shipped yesterday. However, I think what we are really looking for is EDD (Estimated Date of Delivery).
Anyway, to answer your question, I do not have roof rails. My only options besides MIC on my BD 7MT 4 door are Keyless Entry and Painted Aluminum Rims. Others still in production, what are your options? Trying to find a common denominator, seeing that many others from our week have been built and shipped already.