Sponsored

Search results

  1. 03/13/2023 Build Week

    One tracker says shipped other doesn't. Ford CS says shipped no other info. Dealer says shipped but can't see train info yet. I asked them to check the current DORA which should have it if it has been loaded. Waiting.
  2. 03/13/2023 Build Week

    Fucking Ford. Every time I talk to them they verify my email address. I still get zero emails from them! What a shit show of a company. Buying experience which should be great they turn into frustrating crap. 2 years of this train wreck that will never end. I ordered a Mini JCW i watched get...
  3. 03/13/2023 Build Week

    One tracker updated to shipped the other has not updated. Need a train car number from my dealer now.
  4. Problems driving in sand

    Go to low lock and gear up. You shouldn't have too but it will answer some questions about your power.
  5. When Tracking your Build. How long does it Show In Production ? ? ? ?

    I was a Friday the 17th blend date and it showed built on Monday the 20th. Base with nothing being added so an easy build. If your getting Roof Rack, Brush bar, PPF you have to wait for your turn in line at the body shop. Mine has not been update since Monday. Waiting to hear it shipped.
  6. 03/13/2023 Build Week

    I am showing built. Updated Monday but not since. No pic or email.
  7. The Ultimate 2022MY PRICE PROTECTION Flowchart

    So I thought I had this all figured out but now I am confused. Aug. 21 res holder. 22 and now a 23 order. 2 weeks before production I get an email from my dealer stating they need a signed Dora to confirm my build with Ford. They have my DL. I tried doing this in Nov. but they are clueless. I...
  8. 3/20/2023 Build Week with spreadsheet

    2 door BaseSquatch here with a Blend of 3-17. V6 Shows built modules active. Only one rig in last weeks build shows shipped. It was built the 16th and was headed to Austin TX by rail.
  9. 03/13/2023 Build Week

    I went and tried chat. They gave me the link to the tracker. Lame!
  10. 03/06/2023 Build Week

    My rig was finished on Friday. Not shipped yet but getting the 18th to the 24th now moved to 20th to the 26th to AZ. Thinking we are going on the same train this week.
  11. 03/13/2023 Build Week

    So I signed my Dora 7 days before my window sticker was released per Ford. Must be returned in 24 hours. Now the price is up almost 2K including $200 more for delivery. I already had price protection for $2845 but it expires on 4-3 before I take delivery. Will that be increased? No sure how you...
  12. 03/13/2023 Build Week

    Tear Tag now showing and updated tracker.
  13. Price changed 7 days after signing Dora confirming order for production

    So my dealer a few weeks ago sends me a Dora to sign to confirm my order before production per FORD!. I came in to do this in Nov. but was told I didn't need too. Sure. Oh and I have 24 hours to get it back to them! The sticker is $44,350 including the $1595 delivery charge. Base price is now...
  14. 03/13/2023 Build Week

    Delivery date already pushed back 2 days. 4-20 to 4-26 now to AZ
  15. 03/13/2023 Build Week

    Mine is showing up built now in the tracker but no tear tag yet.
  16. WTF !!!Ford Motor Company

    I signed a Dora on 3-2 at Fords request again and it shows a Dora of 44K(including delivery) and delivery charge of $1595 which I signed and accepted. This with the understanding that my 2 door rig has $2845 worth of price protection (per Ford) on a cert that expires 3 weeks before delivery. I...
  17. MY 2023 Build Week Tracking Spreadsheets

    No tear tag here yet from the 17th. Called and was told 4-18 to 4-24 delivery.
  18. REMINDER: 2023 Bronco Order Banks Opens 3/27 for 24 hours Only. Base Model, Everglades, Manual Transmission Won't Be Available

    Base rigs are no longer being scheduled by Ford even if you have an order at this point. They say Q3 before they will even schedule ordered rigs. Mine just got built but if your not scheduled now it will be 2024 in my opinion. Even if you have one on order and not scheduled it will be the end of...
  19. Applying Flex Seal on a mesh Bimini to make it solid?

    I worked for a couple of different companies that made things for them. One was the asphalt in a can. The other is the silicone liquid patches you can use under water. Sales guy came to me 20+ years ago they wanted in small containers and I wasn't interested in doing qrts. I gave them a good...


Top