Sponsored

Search results

  1. Grille Light (like the Raptor)

    I purchased this black plastic stock(way more than Needed). Cut small piece to fit behind the grill holes, cut out to fit the lights, bolted them in and dabbed glue on the black plastic to back of the grill. This way if they ever burn out or get damaged I can just unscrew them to replace. I...
  2. Grille Light (like the Raptor)

    I completed this mod as well, but used a different light. Really like these myself. https://www.amazon.com/gp/aw/d/B07F2MCPJN?psc=1&ref=ppx_pop_mob_b_asin_title
  3. 2.3 Shaping up to be the better Engine?

    I have driven both, and no way I would be satisfied with the 2.3, at least on a badlands with sas. Love my 2.7. The 2.3 would have been settling for me.
  4. New Maverick beats Bronco in drag race.

    Bronco not= drag race vehicle. Who is going to make the video showing the Bronco out 4 Wheeling a corvette?
  5. How long from order confirmation email to delivery?

    I was a first hour reservation and #1 allocation at my dealer. 477 days
  6. Many vehicles currently over MSRP

    No history? 1966-1996 isn’t part of history?
  7. Tailgate table install

    I installed the same table last week. No rattle at all for me, even on these terrible OK roads. I have a 2 dr, but doubt that makes a difference. Nice write up.
  8. Three row Wrangler? This could make me switch!

    The third row will be ok for those humans under 40lbs, and still will be crowded. Had an X5 with a third row. Was a waste of leather seats.
  9. Disturbing News, Dirt Mt. 2.0?

    Same happened to me. My build date was 9-22, many others got their built and shipped emails within days. I just received my built email today. Went into production 9-22 and completed build on 9-28. Could be a QC issue with the Vic, or additional random testing . Either way I would give it a...
  10. đź›  9/20 Build Week Group

    I received the window sticker a week before the blend date(9-22)
  11. đź›  9/20 Build Week Group

    Finally 6 days after the blend date(9-22)build is complete(9-28). Now waiting for the train!
  12. đź›  9/20 Build Week Group

    Both the B6G and the Ford site, both show 9/22
  13. đź›  9/20 Build Week Group

    9/22 Blend date, currently shows in production, but yesterday 9/22 populated as the production date. Modules appeared this morning, expecting a build email today.🤞
  14. Newly Produced Broncos Being Shipped with MIC Top 2.0 Ahead of "Dirt Mountain" Replacements?

    It is all in interpretation. They say they “need” to. They don’t say they are going to, or will replace before new hardtop Broncos. This leaves them an out, which they clearly have taken, maybe because they have more tops a day being made then can be replaced. So they put them on new...
  15. July 1 Email Group!

    After several changes in production dates, got a blend date of 9-22, along with a window sticker.
  16. Reservation program ends for the Bronco - No NEW Reservations

    You might be on to something. Maybe there is a Bronco fairy and we have to supply something in trade for her/him.
  17. Soft Top Down

    Are you serious, I thought it was a 250,000 mile break in. Now it’s 280k. I’m out, enough is enough!
  18. July 1 Email Group!

    Finally got a build week. Aug 23rd 1st hour reservation Early March order BL 2 dr 2.7 Auto Sasquatch Lux


Top