I’m in the same boat. 8/05 blend date. BCE modules populated that night. Bronco6G Order Tracker shows it was built on 8/05, but status still shows as “In Production.” Still no “Built” email yet. My window sticker says it’s shipping by rail, so I don’t think PalsApp would have anything either.I had a 08/05 build day with a soft top and i haven't gotten an email yet.
4-Door Soft-Top
Sponsored