Updated tracker reports 3/24 build date. 2dr Base Squatch. Ordered Jan '20.
Sponsored
I have the same build date with no winder sticker or production notification. Will have to watch yoursMoved from “build week 3/27 to 3/29”. I guess moving more towards a specific day is a good thing. I’m sure it will move around next week even more but at least I’m scheduled to be built. I’m happy and thinking, this is the fun part. Just like the build up before Christmas
![]()
Cool. You can see I’m getting the obx. What’s your build?I have the same build date with no winder sticker or production notification. Will have to watch yours
4 door base ,mic , auto, bumper,switches, sas. I basically wanted auto and hardtop and wanted the lockers .lolCool. You can see I’m getting the obx. What’s your build?
Please not DAnyone's modules populate yet? Any tear tags? Looking at the two build weeks before us it appears a lot of people are getting stuck in production. Thoughts are either
A) They are raptors/wildtraks and they have the HOSS 3.0 steering defect
B) They are manuals and dealing with that grinding weird noise issue
C) They need to go to the mod shop for PPF, stickers, accessories etc
D) There is something wrong with chips again and there's a bunch of chip holds
E) There is a rail shortage
I just moved to “In Production” with a new scheduled date. Says i should have a window sticker but that takes 24+ hours from what i have read4 door base ,mic , auto, bumper,switches, sas. I basically wanted auto and hardtop and wanted the lockers .lol
GOOD FOR YOU! bummer, i am schedule for week of 3/31 and notta.I just moved to “In Production” with a new scheduled date. Says i should have a window sticker but that takes 24+ hours from what i have read. Did you get updated as well?
![]()
So close... Yet so far...
I'm scheduled for end of day Friday, so *fingers crossed*
I’m keeping my fingers crossed for ya. Mine moved a few times and not that I’m out of the woods yet but damn it’s getting brighter. Keep me updated if your changes CheersGOOD FOR YOU! bummer, i am schedule for week of 3/31 and notta.
No modules yet. I'm a 3/21 Blend, but have some accessories, which require mod shop. (2-door Basequatch)Anyone's modules populate yet? Any tear tags? Looking at the two build weeks before us it appears a lot of people are getting stuck in production. Thoughts are either
A) They are raptors/wildtraks and they have the HOSS 3.0 steering defect
B) They are manuals and dealing with that grinding weird noise issue
C) They need to go to the mod shop for PPF, stickers, accessories etc
D) There is something wrong with chips again and there's a bunch of chip holds
E) There is a rail shortage
You will go "in production" this Friday.GOOD FOR YOU! bummer, i am schedule for week of 3/31 and notta.