- First Name
- Kevin
- Joined
- Oct 25, 2021
- Threads
- 22
- Messages
- 1,217
- Reaction score
- 2,352
- Location
- Canton, GA
- Vehicle(s)
- Bronco
- Your Bronco Model
- Base
still āorder confirmedā for meAm I the only sucker left without an in production status?
Sponsored
still āorder confirmedā for meAm I the only sucker left without an in production status?
I haven't talked to Christina but seeing u post this gives me hope i'm around the same build date. I'm just too nervous to call and find out. lolJust reached out to my dealer. They show a 1/27 build date. Hoping that means a window sticker shows up tomorrow or Friday. Thanks for the info.
Iāve been moved from the 26th to the 28th according to my dealerFinally! Got my blend date, 1/27. Still not showing āin productionā status. Iām hoping tomorrowā¦![]()
Awesome! How did you get your blend date ?Finally! Got my blend date, 1/27. Still not showing āin productionā status. Iām hoping tomorrowā¦![]()
itās easy, I called the 1-800# 3x and texted, called and emailed my dealer for a week straight asking for it over and overAwesome! How did you get your blend date ?
Awesome. Just ready.I just got my window sticker 9:45AM but it disappears in the system(?).
Based on what I read,
1/25 blend , rotation 4416
267/1147 in line
Just 5 broncos behind you
I think itās for two different build dates. One group is for 1/24 and the second is for 1/25?Still nothing showing for this guy thatās been bumped 6 times⦠praying I make it through the weekend with no bad news. I have a potentially stupid question as I review the spreadsheet. Why are there two sets of build position numbers? Some are #/1147 and other are #/1012? Two assembly lines? How many of these things do they build in a single week?
I'm with you. My original production week was 12/20. I was subsequently pushed to 1/3, 1/10, 1/17, and now 1/24. Two weeks ago I called the 800# and was told I was scheduled for 1/26, which I independently confirmed with my dealership. The pizza tracker finally updated to 'in production' this evening and the decoding on the back door tracker also changed to 'STRT' today. Still no window sticker yet though.Still nothing showing for this guy thatās been bumped 6 times⦠praying I make it through the weekend with no bad news. I have a potentially stupid question as I review the spreadsheet. Why are there two sets of build position numbers? Some are #/1147 and other are #/1012? Two assembly lines? How many of these things do they build in a single week?
Those are two separate build dates; the 24th & 25th. But, as I understand it, there are two assembly lines that both produce Broncos and Rangers. I think I read that full production capability is ~15,000 units/month but I'm not certain on that number.Why are there two sets of build position numbers? Some are #/1147 and other are #/1012? Two assembly lines? How many of these things do they build in a single week?