Mine is the same, the only change is estimated delivery 1/25/2022-1/31/2022Pizza - no change
Mods - no change
Backdoor
![]()
Sponsored
Mine is the same, the only change is estimated delivery 1/25/2022-1/31/2022Pizza - no change
Mods - no change
Backdoor
![]()
Does anyone know if these estimated delivery dates have proved accurate in past build weeks? It says mine was built 1/7 with a delivery eta of 1/9-1/15 which sounds super aggressive to ship convoy to MarylandBuilt on the 7th. Blend date of 1/3.
Mine shows an estimated delivery 1/22-1/28 to Florida
![]()
Same here, but a day earlier on the delivery.Maybe the IT system needs to catch up to the Manf system!!
Odd, my pizza tracker still shows, In Production, but the status text under the pizza tracker now provides an estimated delivery date of Feb 6.
The tear tag revised, but no mods populated.
Me! Right there with you.Anyone else?
![]()
My dealer(uncle) tells me those are wrong 100% of the time.Does anyone know if these estimated delivery dates have proved accurate in past build weeks? It says mine was built 1/7 with a delivery eta of 1/9-1/15 which sounds super aggressive to ship convoy to Maryland
queue the sad trombone....My dealer(uncle) tells me those are wrong 100% of the time.
Interesting on ordering the 2.7. From what I have heard this is not a constraint in terms of production line. The stuff causing delays was other minor items (A few weeks ago they kept running out of half shafts. That caught up then they kept running out of another part last week, then this week was another slow down for something else.. etc) "Little" misc parts or events that cause backlog on occasion. I would imagine this is a pretty normal occurrence as things are ever fluid for production plants, and worse with Covid supply crap.No updates here. It looks like they’re 3-4 days behind though sadly.
I wonder if it is parts or something else causing the slow down. It just doesn’t feel right that it would take them 4-5 shifts to fully move one Bronco down the line. I know Ford is no longer allowing 2.7 Engine orders or 4DR Hardtops, so I’m assuming the issues with those two parts are causing slowdowns. There are about 20 members on here who have had 2.7 Engine problems (One guy is waiting on his 3rd Engine). Some food for thought. Congrats to all with progress. Please post your Bronco pics when you get them!!
It’s weird I’m totally ok with the 34 day delay ……as long as no dreaded bump emails I’ll be fine!No updates here. It looks like they’re 3-4 days behind though sadly.
I wonder if it is parts or something else causing the slow down. It just doesn’t feel right that it would take them 4-5 shifts to fully move one Bronco down the line. I know Ford is no longer allowing 2.7 Engine orders or 4DR Hardtops, so I’m assuming the issues with those two parts are causing slowdowns. There are about 20 members on here who have had 2.7 Engine problems (One guy is waiting on his 3rd Engine). Some food for thought. Congrats to all with progress. Please post your Bronco pics when you get them!!
34 day delay. That escalated quickly, LOL.It’s weird I’m totally ok with the 34 day delay ……as long as no dreaded bump emails I’ll be fine!![]()