I had a reservation from July 18, 2020 4DR Badlands with Sasquatch, 2.7, MIC, until Thanksgiving 2021 I had not heard anything. I placed an identical order with everything except a soft top instead of the MIC top on November 23rd 2021. I got a VIN and build date 18 days after placing the soft top order. I got a build date 1 week later for my MIC reservation/order. The soft top had a build date of 2/7/22 after a few bumps the blend date was 3/1/22. My MIC reservation/order had a build date of 2/14/22 after a few bumps the blend date was 3/17/22. The soft top is still sitting at the plant on hold. I took delivery of my reservation/order on 3/23/22.