I am guessing we will start seeing that tomorrow or Friday for the 9/26 folks.Has anyone’s tracker changed to “built” yet?
My blend date is 9/29. Ford chat told me dealer delivery ETA is somehow still 10/3-10/8.I
Did you get a window sticker before you got pushed to 10/10 or is that not a thing?No, in fact after chat said delivery of 10/17 I got an email 12 hrs. later saying I was pushed to build week 10/10.
Tried no to get my hopes up but somehow I knew I wasn't done waiting yet...
I mistakenly put in the vin for the bronco that was built in May and got really excited this morning until I realized what i had done.I HAVE MODULES!!!
I'm still listed as "In Production", but it's getting closer, y'all!!!
JR
![]()
When the modules pop does that mean its been released for shipping or could it still be in a stage of quality control?I HAVE MODULES!!!
I'm still listed as "In Production", but it's getting closer, y'all!!!
JR
![]()
I would assume it could still be in QC. The modules comming on would signify the vehicle has power which would be required to drive for QC.When the modules pop does that mean its been released for shipping or could it still be in a stage of quality control?
According to the thread here, when the modules pop online, the vehicle has been built, and is "alive". There might be additional work that needs to be done, but presumably, the engine has been started, it's off the production line, and has moved to an area where things can be completed. At some point, assuming that they're not missing components for my tow, MIC, high, or SAS packages, it'll change from "In Production" to "Built", then go into a holding pattern for shipping.When the modules pop does that mean its been released for shipping or could it still be in a stage of quality control?
I mistakenly put in the vin for the bronco that was built in May and got really excited this morning until I realized what i had done.
Kind of what I’m noticing from looking at the previous build week thread comments. About 2.5 days behind blend to modules.Last unit I looked at was rotation number 7344, and was 314/1061 with a blend date of 9/26. It looks like MAP is running right around 40 units per hour. It looks like they're about 2 days between blend and first hitting the end-of-line process, which makes sense. My plant runs WAY faster and it still takes 4-5 hours to get all the way through end-of-line from body-mate ("blend"). That seems like they're maybe a little behind, but I'll take it.
Pretty typical ramp up. Once we start getting shipments and receipts plus the inevitable built not shipped stuff it will get REAL loud.Pretty quiet in here for a build week