The longest part of the wait is getting scheduled for production. That could take a week to 6 months to a year depending on multiple factors. The biggest things that will hold it up are having constrained items like SAS and hardtop, and depending on the amount of allocations your dealer has. You will get the scheduling email a month or two before your build week, and then it should take a week or two to get built. This is the point of the process where everyone in this thread is at right now. And then delivery can take anywhere from a week to 2 months. You will learn very quickly that while there is a process to determine how long these things take, it usually never works out that way. Just gotta wait and hope you get lucky. Goodluck!Not sure if this is the right place to post my question but how long does it take for a Bronco to be scheduled for production these days?? I was able to order a 24 Everglades yesterday. My dealer said he has no idea how long the wait will be especially since it's an Everglades model (He said could be 8 months and could be a 2 year wait) so I'm trying to get a better idea. Thanks in advance!
Sponsored