I’m still in production too. I’m hoping it’s just the roof rackI wish I knew, mine is 8/4 and still I. Production..According to the excel sheet some of us filled out , it looks like majority of 8/4 builds aren’t done yet..
Open the spreadsheet and add your informationHey all! First time caller, long time listener. I’m late to this game but how can I get added to the spreadsheet?
8/1 Build Week SpreadsheetOpen the spreadsheet and add your information
Does anyone know if we can expect updates this Sunday or do we wait unti tomorrow?I’m still in production too. I’m hoping it’s just the roof rack
I've read that the module site will populate about 1-12h after the modules are programmed in the factory. It also seems that the factory operates six days per week.Does anyone know if we can expect updates this Sunday or do we wait unti tomorrow?
The tag will come if you have your modules. Mine took three days 8/2 blend.Mine moved to In Production last Thursday and the tracker showed the Blend date as 8/4.
Saturday morning I noticed the BCE modules were populated but no Tear Tag. Checked a couple minutes ago and still shows no tear tag and still in production. I’m hoping it will move into Built tomorrow.
Dale
Outer Banks, 4 door, 2.7, auto, soft top, Lux, Tow, carbonized grey
Order 2/19/22, Blend 8/4/22, Build 8/5/22
I'm a day behind you with a roof rack and brush guard, still in production. Hopefully its just the accessories.I'm an 8/2 blend. Modules and tear tag populated late 8/3 I believe but still showing "in production". I ordered the removable hoop step so I'm assuming that's installed on a different line and holding it up from moving to "built".