I'm in the same boat. I haven't gotten an email either but I'm a 2/8 blend and that won't be happening with the shut down. A bit nervous and hoping that doesn't mean a significant bump.I feel like I'm the only 2/7 build that has not gotten the email stating anything has changed. Backdoor link hasn't changed, got my window stick yesterday with blend date of 2/8 and no email. This is frustrating as I know they won't be building that week, so I'd sure like to know what week I'm being bumped to!
Sponsored