Just got my VIN and scheduled for 1/3/22!
4dr Badlands, 2.7L, Lux, SAS, MIC, Mod Bumper.
June '21 Res, Early July '21 order.
What are the odds this builds anywhere near ontime?
My build is a Badlands, SAS, 2.7, LUX, MIC, and tow. Pretty much the most unbuildable Bronco there is. However I'm getting concerned I just wasted 3.5 months of waiting for reasons I dont understand. Why would my dealer 99 my order for that long?
I have seen a lot about priority code 99. What does this mean and why does it exist? Also, I ordered my Bronco way back in July and just now got my order confirmation. Why would it have taken that long?
This picture got me thinking... What if that was inverted? As in; the "Bronco" badge gets installed where it was on the Gen 1s, then the model badge gets re-stickified lower on the fender ( maybe even 2/3 of the way down on the door)?
I have heard both the B&O, and the standard. The B&O was in a 2 door Wildtrak, the regular in a 4 door Badlands. I agree as another poster said. The Standard system sucks. One of the worst I've heard. The B&O system exceeded my expectations. It is very adequate. Just my $.02
I just checked the dealer site and they don't show it. Otherwise I'd send you the link. Its the Bronco I test drove, and the one that convinced me I needed one.