Sponsored

Search results

  1. “Your Bronco Has Been Built” Status Thread! 🤩

    I was a 6/29 build and delivered 7/13, slow train, sat in CSX Depot in western mass for about 7 days as well
  2. Considering Changing from Badland to Outer Banks. Help!

    Went with the 3.73’s, lot of highway driving in my opinion for the 4.27’s. Did think hard about the 33”’s but figured go with the 285/70/18 TA’s later.
  3. Florida man reviews (harshly) outer banks 4 door

    I will say one negative about the OBX soft top, make sure you are very careful when you close the soft top from the full down position. The weight of the top allows it to shift ever so slightly and rub the painted roll bars. I did put a scratch in mine from the metal frame rubbing it. Not an...
  4. Delivered MIC Hardtop Roof: Close-up Pics of Exterior, Interior Finishes

    @ PREMiERdrum-Hope you can shed some light on this question. My OBX was delivered to dealer today 7/13, delivery is tomorrow. It had a 625 blend and was built 629 during that crazy rainstorm when MAP was shutdown. The driver side rear window has the word "WATER" in white marker written on it...
  5. British Columbia Bronco Owners! Anyone seen one arrive in BC yet?

    6/29 build dealer lot today 7/13 . Delivery tomorrow 7/14 Boston Ma area. One interesting note, there is the word "WATER" written on the drivers side rear window in white marker from factory. This Bronco was built during the Detroit rain storm that weekend. doesn't appear to be any signs of...
  6. My Cactus Gray Big Bend just delivered. First pics & early impressions

    One of these gray OBX’s is mine I am pretty sure. It’s sitting in a Massachusetts depot lot, waiting for a truck ride to my dealer. Born 6/29.
  7. Day 1 With 4Dr Badlands- Week 1 Updates

    Looks great!! I had a 6/25 blend, built 6/29, shipped 6/29, sitting in a CSX rail car since then. Hopefully it arrives in Boston next couple of days!
  8. đź§­ Track Your Bronco Order by VIN + Order Number [& Get Your Window Sticker]

    Believe i I believe is a more accurate number of days of transit- Ford is very conservative. My update “Transit” say 12 says with a delivery of 7/25-31.
  9. Can’t lie; our OBX was suppose to be built today 6/28; not done.

    Anyway to track a CSX rail car ? Says my OBX is in Wayne MI on a rail car.
  10. Anyone's Bronco built yet? ETA for delivery?

    Built 6/29, in transit to Boston 7/25-30
  11. đź§­ Track Your Bronco Order by VIN + Order Number [& Get Your Window Sticker]

    That is very funny, I am selling my 2020 F150 Supercrew next week as well. Market is good enough to get out early.
  12. đź§­ Track Your Bronco Order by VIN + Order Number [& Get Your Window Sticker]

    Same here, update tells me 7/25 to 7/31 shipment, but also says shipment duration is 14 days. I was told they give worst case timing.
  13. MAP is packed!

    Not sure, could be mine!
  14. Does anyone still have a June build date?

    Crazy stuff it seems this weekend, I had a 6/25 build date nothing until Today am at 1:43 and then at 4:46.am. Built and shipped!!
  15. “Primary Status: In Production”

    I am wondering if they are pre-release production dates in the system since they are not running the week of 7/5 so when they return 7/12 everything is ready to go. Just a thought
  16. 06-26-21 Granger Ford Update

    Any idea of how to get on vehicle door storage bags for a soft top OBX. They are not orderable during build and don’t want the garage bags. Thanks
  17. Delivery Destinations and Timelines

    built 6/26, in transit due 7/25-31
  18. Can’t lie; our OBX was suppose to be built today 6/28; not done.

    I had a 625 blend and print d I hope so. I had a 6/25 blend as well as 6/25 print date. This morning ( 1 and 4 AM EST) system was updated with "Built" and "Shipped". Hang in there..
  19. Can’t lie; our OBX was suppose to be built today 6/28; not done.

    There was another way a poster recommended. It was to look at the window sticker on the bottom border and it shows a print date of the actual sticker. They said that has something to do with printing for gate release etc. But not 100% I have it correct.


Top