I'm still showing scheduled to week of 1/8/24, but not "In Production" (nor do I have a window sticker yet). Seeing as this is a holiday week, I'm not concerned. I'm still pretty happy I got scheduled so soon to begin with.
My Badlands 4 door manual hardtop is also scheduled for the week of 1/8/24. I was really surprised it was so soon based on what I read about 7mt production constraints.
Just wondering how manual transmissions are being scheduled and VINs issued if there is 0% capacity shown on the report? My 7mt 4door Badlands is scheduled for the week of 1/8/24. I got my VIN and build date today (12/6). I'm pretty happy, I was expecting a long wait to get scheduled.
Badlands 4door
Manual Transmission, Hard top, Mid Package
Ordered 11/5
Scheduled build week 1/8/24
I got my VIN on 12/6
I was really surprised how quick it was scheduled, especially being a manual transmission.