I didn't ask.
My buddy had ordered one (no reservation) on 12/15 and had a VIN/build date of 2/14 the next week. I ordered right before Christmas (right after he got a VIN so fast) so I think mine only took that "long" because of the 3 weeks off for the holiday and catching up. I could tell...
One with a reservation I made 8/13/21 and one that had no reservation. All I've learned is that allocation is the biggest constraint at this point. The reservation system really means next to nothing.
The build is pretty easy - a 2022 4 door Badlands with 2.7, Sasquatch package, and high...
I mean I ordered before him with a reservation and don't have a VIN yet. Everything else was the same except I got high package and he got lux. Both badlands, sasquatch, soft tops with 2.7s
Meanwhile a buddy of mine ordered one week ago today (12/15) no reservation for a Badlands Sasquatch with Lux and the 2.7. Got a build date and VIN already.
I hope I have the same luck you did. Ordered yesterday 12/10. Badlands, Sasquatch, high package with the 2.7 and soft top. Reservation from August 13 2021, so I’m not holding my breath.