As we figured, they are not going to steal good tops from the line for those of us stuck “in production”. If you’re scheduled, they have the components to build your rig. If your build passes QC, you should be good get your “built status“ and ship. Those of us built in late June that did not...
The ones that that happened to had received a “built” status. Stuck in production I’m pretty sure they are just sitting there likely awaiting new roofs.
My 2 door badlands is stuck in production, likely with a “bad roof”. Not seeing any 2 doors move out of the production purgatory. A few got through as I guess they passed QC but if you got held up I think it’s going to be a bit. Not sure what that means for 2 doors going forward… I would imagine...
Your not stuck in production. Your tracker has updated. You passed QC. For those that are stuck in production here would be a very real reason. These are likely QC holds not trackers not updating.
Well hell, I can put two and two together. This is why we are stuck in production:
https://www.bronco6g.com/forum/threads/i-don’t-want-to-worry-2dr-buyers-but-this-doesn’t-look-good.19133/
@Bud2020 I did get the Ford email today for 7/26. I was the first reservation at the dealer (although probably not the first pulled for Mullinax) with timestamp of 8 minutes after the reservation site went live. I had a lot of the deadly sins so 7/26 isn't too bad considering. 2DR (MIC) BL...
Got mine, week of 7/26. Good news for all is I have just about every deadly sin: 2 DR (so Hardtop) Badlands, 2.7, Squatch, High, Towing, Unobtainium shifter etc. So not too bad on the date considering. I do have an early reservation though of 8 minutes after the site went live...
Got mine, week of 7/26. Good news for all is I have just about every deadly sin: 2 DR (so Hardtop) Badlands, 2.7, Squatch, High, Towing, Unobtainium shifter etc. So not too bad on the date considering. I do have an early reservation though of 8 minutes after the site went live...