So.. what if your husband decided the OBX Squatch reserved 7/19/29 and ordered 2/14/21 wasnāt what we wanted and on 8/8/21 totally changed the order for a badsquatch- Iām totally lost because my Ford online info and original paperwork have it at $51,980 and the new paperwork is $61,120 or some...
3 weeks? Thatās crazy! Yours is still showing in production? ⦠Iām blaming my shipping issues on the fact that Iām in California and I know everyone hates delivering here𤣠my youngest drives OTR and gripes every time he delivers to Cali
Iām in central California, we have a railroad embargo on cars, car parts and some agricultural supplies on top of all the other shipping issues. The crappy thing is that itās been sitting there for 2 weeks while people an hour from me have picked theirs up. I have to run some errands today so...
Just got off with Ford chat again⦠mine is still sitting on ramp 51 in the MI rail yard. š¤¦āāļø No railcar info and no updates since 8/11š¤¦āāļø8/24-8/29 was my original delivery estimate then it went to 9/4-9/10 but I donāt see that happening now either. And I never got the assembly line picš„¹ I
Ours was still sitting at the rail yard in Michigan when I checked Friday⦠(build date 8/7) Went from 312 in same status to nearly 1300 now 𤣠at least those are all built š¤·āāļø
I leased the BB mannequin, originally we were going to trade it when ours came, but nah..𤣠we may lease the second, it will depends on the interest rate and If I can sell my car and hubby gets rid of the damn Harley in time. Several of the team at our dealer have leased theirs as wellā¦
Same- I was a cashier at Home Depot before UPC codes and scanners were insyalled so memorizing number sequences is a habit. Now I need to memorize my BB VIN so she doesnāt feel left outš¤£š¤¦āāļø Sheās anxiously awaiting her sisters arrivalš¤£š¤£š¤£
My build is a BL, Squatch, mic, mod bumper high pkg, MGV
Iām from 8/1 week
blend 8/4
in production 8/5
built 8/7 ,
Shipped 8/17 1:36 am and in transit as of yesterday afternoon. My original ETA was 8/23- 29, and changed to 9/3-10 to central California
no assembly pic yet,although several...
Theyāre being trucked from Portland, but apparently thereās a trucker shortage/backlog as well. And they wonāt ship unless thereās a full trailer, it wonāt pay enough.. As the mom of an OTR driver, I also know they hate coming here.. our sales mgr in Turlock had his Bronco sit in Richmond for 2...
Yesterday mine was at 315 and similar in status are over 1800 now, but mine is built and waiting to shipā¦( status is shipped but tracking info NA still)
Greatā¦. Now Iām gonna be stalking my stupid email until I get my pic š¤£š¤£š¤£
But yay for yāall!! Itās almost Over!
What will we obsess over now? š¤·āāļøš
i
Same ⦠even got the āneed additional timeā email about 5:15 yesterday, then the shipped email came at 1:36 this morning, Hopefully they donāt have to sit long before trucking here from Portland.. eta still 9/4-9/10. Guess Iāll see if I can get railcar info today
I just came to lurk and see how yāall were doingā¦.. BadSquatch was 8/1 with 8/4 blend 8/5 in prod and 8/7 built and still not shipped.. vehicles in same status has gone from 400something from last weekend to 321 when I checked yesterday.. apparently ford is having issues with shipping⦠and is...