You car is in New Jersey, it has been dropped off at the final destination rail yard where it sits until it is picked up by truck transport to your dealer.
You are now tracking the empty railcar that is back in Ohio.
I think the picture that was posted was this stripe in white:
https://www.undergroundgraphics.com/products/bronco-center-stripe?_pos=1&_psq=center+stripe&_ss=e&_v=1.0
I am guessing that Ford is allowing some orders to go through that were erroneously not entered by dealers to be accepted on an exception basis in order not to penalize the end customers for dealer or Ford errors.
Rear seat cup holders are apparently included on MY 24 4 door HEs, this is from the week 1/8 thread at a dealership in Indiana where the dealer posted some pictures of a newly arrived 4 door HE.
we ought not put too much faith in the tracker, it is notoriously unreliable. It’s luck of the draw as to when it updates and often does not reflect reality as demonstrated in this case where the tracker has yet to update since 01/02 while the vehicle has been delivered to the dealer.
A 2001 Toyota Tundra with 303 k miles, a leaking power steering fluid case, worn out piston rings, 4.7 L V8 engine, torn up upholstery and peeling paint.
No new orders for Heritages can be entered any longer, the deadline for the 4 door was November 27, and the two door was December 4th.
they scheduled a lot of “priority” trims that includes Heritages, Everglades, and Raptors on November 16, I think they had one other scheduling that included...
Manual is not zero, in fact many MY 24 Manual Transmission are being built and scheduled, this zero value is for the 2023 MY production capacity where they restricted the manual ordering .
Ford has not bothered updating this value for the 24 MY.
It stands for variance in percentage points. (var. ppts)
The difference in percent of order mix for a trim or commodity in the Unscheduled Order Banks (USOB), and the percent production capacity for such a trim or commodity at the plant.
It used to be significant when orders exceed capacity...
Ford was not sending email notifications for Broncos last year due the strike and its chain effects.
since your vehicle was scheduled for last week, your vehicle has a VIN assigned to it, also it is probably built by now and getting ready to ship.
Your options:
1. For a more complete tracking...
PCM = Powertrain Control Module
BCE = Body Control Electronics
From Wikipedia:
“A power-train control module, abbreviated PCM, is an automotivecomponent, a control unit, used on motor vehicles. It is generally a combined controller consisting of the engine control unit (ECU) and the transmission...
I also had a March '23 order that never got scheduled or built and had to re-order a 24 at a new price level with no transition private offer.
My original build price at price level 340, if I were to use the exact same options as what I have on my current 24 order would be $54,180. I had an...
Note: this is a Heritage Limited Edition, which has the black rims with the ring, if you have a standard Heritage on order it will have white rims instead.
A tear tag is issued once the vehicle passes the emissions inspection test, which is the last step in Ford’s inspection protocol. If the modules are populated but you don’t see a 4 digit alphanumeric code on the modules page right under the VIN, it means the vehicle is built, but still...
I ordered in mid April, was told 12 to 16 weeks, then it stretched to 20 weeks.
My dealer received my top in late August (Colorado Bronco Upfitters- a great company that I highly recommend, honest with great customer service) and it was installed September 1st.
I love the top and it looks and...
No one knows for sure since there are always exceptions where some part is missing or the build does not pass final inspection resulting in production and/or shipping delays.
With that caveat, a delivery date between the 20th and the 30th of January is a reasonable guesstimate to NC, if all goes...