Sponsored

Search results

  1. đź›  01/24/22 Build Week Group

    I WOULD DO THAT IN A HEARTBEAT! LET US IN! :)
  2. đź›  01/24/22 Build Week Group

    m mine changed around my blend date 1/27......built. but still waiting for chips
  3. đź›  01/24/22 Build Week Group

    PCM Code Configuration KDB3 2.3L, Automatic, 4-door ???? 2.3L, Automatic, 2-door LJM3 2.3L, Manual, 4-door LCW3 2.3L, Manual, 2-door NDZ2 2.7L, Automatic, 4-door NVS2 2.7L, Automatic, 2-door
  4. đź›  01/24/22 Build Week Group

    Agree, snow covered then baking in the sun not a good combo
  5. đź›  01/24/22 Build Week Group

    Yep, The 4 door MICs' are still the "unicorns" . I've seen maybe 3 on the road
  6. đź›  01/24/22 Build Week Group

    Keep in mind the spreadsheet is just a snapshot. There can be hundreds of builds between neighbors on the sheet
  7. đź›  01/24/22 Build Week Group

    Have not checked my mods page in a long time. I wonder if every option is loaded and some will be blank just due to package selected.
  8. đź›  01/24/22 Build Week Group

    Thats more progress than I was expecting actually, But still a loooong way to go :(
  9. đź›  01/24/22 Build Week Group

    My dealer never has never had more than 1 on the lot. Now has 8……All “Softies”. Must all be people who moved on
  10. đź›  01/24/22 Build Week Group

    That will happen from time to time
  11. đź›  01/24/22 Build Week Group

    I got the same thing from Corri in an email... The edd magically changed to a completed by date....No other explanation, production is complete just waiting for the mysterious chip delivery yet they have all the chips for the current builds
  12. đź›  01/24/22 Build Week Group

    Just a bunch of people Working on the "Penske File" :)
  13. đź›  01/24/22 Build Week Group

    The Lux package itself doesn't upgrade the bumper, but most Wildtrack pics do show the heavy duty modular which is a $1,690 upcharge
  14. đź›  01/24/22 Build Week Group

    Don't see gas going down anytime soon. As I mentioned in a previous post, gas was $2.35 when I ordered the Bronco. An electric for our 2nd vehicle is making more and more "cents" :) evreryday. I'm looking into the Hyundai Ionic 5.........
  15. đź›  01/24/22 Build Week Group

    In an email response from an exec from Ford, "just for kicks", I thought I would just throw out the question about shipping our trucks without chips based on the reports. This was the response: That is not something that I have heard spoken about within our Executive Meetings. If that comes...
  16. đź›  01/24/22 Build Week Group

    Took 2 weeks to get a direct email back….. I received information from the plant today that advised that your vehicle is expected to be completed 5/17/22. There is no way to expedite it at this time as the production is completed and just waiting on the Micro Chip shipment to arrive for final...
  17. Never got your assembly line photo? Maybe someone has a match!

    Looking for Big Bend 4 Door Mic Hardtop with Tube step standard lighting, Carbonized Gray
  18. Ford will ship Broncos without chips controlling non-safety critical features

    GM has been doing for awhile now....Just cause the Bronco is under such a microscope it's blowin up
  19. Ford will ship Broncos without chips controlling non-safety critical features

    It's gonna be a logistical nightmare for them but it has to be done...Ultimatley buyers will be alot more forgiving when the trucks are in their driveways instead of who knows where


Top