Sponsored

Search results

  1. Good by Bronco

    Oh I forgot the E brake switch that I'm always fumbling with . Truth is guys I pre ordered this thing way back when it was a $100 down . I was really hoping it was going to be like the OJ bronco size but now I'm getting a F150.
  2. Good by Bronco

    Well I just cant take it any longer , Basically the bronco is not user friendly and it is just to dang small . No window frames on the doors leads to whistling on windy days , the window switches in the center console is just plain maddening , the two piece tailgate with spare tire is...
  3. MIC Hard Top Wind Noise Reduction - 2023 Edition - Plus Bonus Fix for Bad Adhesive

    I will never remove the roof panels so i might just silicon the seams and see if that works .
  4. Wiper control speed issues URGENT SAFETY

    Same here 2022 Badlands . I have to keep changing the wiper mode switch to keep them going .
  5. Need Help with steering wheel shaking after 3" lift with 37s

    Driveshaft !!! You lifted a perfectly good rig 3" the driveshaft must be altered .
  6. build week 10/24

    I used Downtown ford of Sacramento.
  7. build week 10/24

    Anyone in this group still waiting. My bronco is in port Richmond awaiting a truck to bring it to the dealer still.
  8. Unofficial Awaiting Shipping thread.

    When I call the CSX trace line all i get is minimal info like , Loaded , Train arrival , and the latest Delivered . But no state or town info . I am in northern CA .
  9. Help! Dealer went out of business

    What Dealer I am in Ca also awaiting my delivery .
  10. build week 10/24

    My Train just departed from the origin headed to NorCal 11/15 .
  11. build week 10/24

    Just got the email 10/27 blend. It's on a train heading to CA.
  12. build week 10/24

    10/27 blend date , Tear tag showed up this morning . On step closer .
  13. build week 10/24

    Modules popped up over night 10/27 blend almost there after two+ years , Now i will have to wait for it to ship to Sacramento.
  14. build week 10/24

    Got my WS from Jimmy G`s link .
  15. build week 10/24

    Is in production a blue circle or a green check.
  16. Build week of: 10/10/2022 Spread Sheet Attached

    Also bumped from 10/3 to 10/10 . Badlands non sas 2.7 .
  17. Build week 10/3/22 Group

    Bumped from 9/19 to 10/3 . Badlands , green , 2.7 , hardtop , non sas .
  18. 9/19/22 Build Week

    I am in also 7/29/20 reservation . Re ordered 11/2/2021 . Green 4 door Badlands high package 2.7 . congrats all .


Top