Hard to say. We have another Bronco with a 1/7 Blend date and it’s showing in production still with no build notification. Ice Mountain I guess so hopefully this group goes more smoothly
The date at the bottom is just the date the window sticker was generated from the system. It will change each time you try to retrieve it. If it doesn’t change then it must be cached or something.
We have two Broncos on order. One is in the 1/3 Build Group and one is in the 1/31 Build Group. One is mine and one is my son's. Our 1/3 Bronco is still in purgatory with an in production date of 1/11 and estimated delivery showing 2/7 but no built or shipment updates.
I have a window sticker with a blend date of 2/3 so I don’t think that’s correct. I think the window sticker is created within a week of the build date.
Still no window sticker but supposed to be a 2/1 build. We also have one in the 1/3 build group and it’s been slow and no ship date yet for that one. It was a 1/7 blend and showed up in production 1/11 and then nothing. That one is built and just sitting there.
I’m scheduled for 2/1 according to my dealer but my tracker hasn’t changed yet. That should change early next week along with my window sticker populating