So I'm just guessing that the train heading to Ca won't load until all the Ca-bound trucks are built. Who knows what circuitous route it will take?
Let's get built Ca Crew!! @AMCheese, @BigRig, @Dubstep559, @chips2014, @luxray, @BAD_ZEPHYR, @Horsepower Dad, @Bow, and a probable neighbor, @Sharks
Reservation placed 7/15/2020 (#10246253).
Order placed 10/08/21
Got my email notifying me of the week 5/2 build at the end of the day at Off-Rodeo NV.
4D Badlands
Sasquatch
Cactus Grey
2.7 L
MIC top
Lux package
Tow package
I believe I'm a day two reservation holder. I placed the order for my 4D Squatched Badlands 2.7L Hardtop Lux in Cactus Grey on 2/1/21.
I have all the stuff that seems to be delaying the builds. No interest in changing any of it. I've been resigned to the probability of a 2023 build.
This last...
Replace Focus St with Subaru STi and that's me.
The longer the delay, the bigger my down payment will be.
It'll be the first time I've ever had two 4 wheeled vehicles at the same time.
Happy to see the non squatch BL looking so nice.
I've been back and forth on SQ and Color. I finally went with CG,
and just last week dropped the SQ off my build.
Congrats Matt!!