Dang, so all broncos get dropped off in OKC before headed to Tulsa I assume? Mine is scheduled to be dropped off on 11/8 according to Union Pacific phone number but not sure where that drop off is.
My dealer said mine was in Cincinnati on Wednesday, supposedly shipped on 10/25 according to ford email, he gave me the railcar number but it hasn't moved. UP number says loaded and next stop Illinois. It is headed to Tulsa.
I assume they knew they couldn't get the new tops made in order to deliver 2021 broncos so they decided to dress the 1.0 tops up and send the broncos home. I bet all of these tops will end up getting replaced with the true 2.0. Who knows though.
According to the below website "Next, Ford Performance is offering a “severe-duty” steering rack and tie rod ends for better steering durability under high loads." Sounds promising if it becomes a real issue.
https://www.bronco6g.com/custom-build-broncos-to-debut-at-sema/
My modules populated and the code webpage says it was built 10/19/21 but still no email that it was built or shipped. The code website says still in production also. 10/15 blend date.
I called my dealer yesterday, originally 9/13 build week. He stated my build day was 10/14 so I assume I am at the end of the 10/11 build week. Fingers crossed. Badlands soft top, sas, lux.
I think part of the reason they cant bulge out the fenders more is the rear door. If they did that they would also need to modify/bump out the rear doors to mesh with wide body fenders.
What is the expected build dates that will go out tomorrow? early or late August. Curious because of the hard top ready builds that start in September.
I reserved 7/14 with a Tulsa dealer. They called yesterday and said I needed to confirm with them that I still wanted the bronco and that they would refund the 100 deposit and charge me 500. I thought that seemed fair but now my order was changed to in store order and the guy said I could spec...