Tracker still showing in production, but modules are there. I have a blend date of 10/12. Anyone else in the same boat as me or is the system just moving slow for me?
White Base, 2.3L, AT, SOFT TOP (was hard top), SAS w/ AUX switches scheduled. I have been checking the tracker every day since I got the email. Been ordering parts all week so as soon as it hits my driveway the build will start.