Sponsored

Search results

  1. đź›  11/8/21 Build Week Group

    I think we are tracking the same train but it is BNSF not UP. Mine is in Belen New Mexico now. I suspect SoCal tomorrow night and Norcal the next day.
  2. Thinking of ordering a 2 door

    How is this even a question. From your own experience you know what a real Bronco is and how many doors they have.
  3. đź›  11/8/21 Build Week Group

    i have the roof rack on my build. My built date was 11/10 and modules popped about 7:15pm pst that night. I got the shipped email on 11/13 at 1:48am pst.
  4. Hey California, anybody got a positive review for a dealership with NO MARKUPS for their Bronco?

    I can’t say enough good things about Serramonte and @Gloff. He puts up with all my annoying questions and build changes. I’m driving down from Sacramento to do business with them. I’ve recommended friends and family to them as well.
  5. đź›  11/8/21 Build Week Group

    I tracked mine last night and it had left Chicago. It looks like I’m gonna have this sucker in time to drive it to Off Roadeo in Moab. I’ll be there 12/11. You’ll know me by the B6g pizza sticker on the rear glass.
  6. đź›  11/1/21 Build Week Group

    Got this today. 11/10 build date.
  7. 35s on 17" steel wheels

    Which running boards are those?
  8. đź›  11/8/21 Build Week Group

    I got the shipped email this morning at 1:45am pst. ETA range 11/25-12/1 to SF Bay Area.
  9. AR | S.I.T.H. Modular Bumper Shackle - Common Hardware REIMAGINED

    Tensile stress allowable of 7075 doesn't tell you much without the cross-section properties. What is the breaking strength? Did you analyze off-axis loads? What is the Safety Factor? Shackles are typically at 5 or 6x the stamped safe working load.
  10. For the 2-door people that have either already received and/or scheduled their Bronco for delivery, what was your reservation date?

    Reservation 7/13 within first 3 hours Ordered 1/20 Vin 9/30 Built 11/10 Estimated delivery 12/1
  11. đź›  11/8/21 Build Week Group

    My estimated delivery date showed up just now as 12/1. I'm in CA and my dealer says they average 19 days from build date to delivery. So that aligns well with the holidays thrown in.
  12. đź›  11/8/21 Build Week Group

    not sure, what is rotation number? Edit: nevermind I figured it out, it is 1998
  13. đź›  11/8/21 Build Week Group

    I got my window sticker this morning with an 11/10 build date. Thanks @Ford Motor Company
  14. đź›  11/15/21 build week group

    I just got bumped up to 11/8 as well. Nice knowing you all.
  15. đź›  11/8/21 Build Week Group

    Hi everyone. I just got bumped up from 11/15 to 11/8. Hope it sticks.
  16. Bad news about MIC 2.0 quality after a few days

    Honestly these delaminations can be fixed pretty easily with some epoxy and some clamps. I've repaired hundreds of skis and snowboard delaminations similar to this and they have lasted a long time under harsher conditions than the Bronco tops will see. However, each repair takes time and it...
  17. 1st night 2 door Bronco reservations, are things coming together yet?

    I have a 2dr reservation from the third hour of going live and got a build date of 11/15 back on 9/30.
  18. Tried to convert my reservation , 10k mark up by Future Ford of Sacramento

    Don’t forget Serramonte Ford in the Bay Area. Contact @Gloff for details.


Top