great coverage for us thank you sir,What is the ratio of two door or four door? what is the overhaul condition of parked broncos, most look like their parked on crush in run stone.and last have the capacity of vehicles diminished since last week?
well lol,the tons of broncos built in the yard,must be finished before they build any other MIC Style Broncos. based on build date vin ect, F/E Takes precedence.So the guys with build dates that keep moving out that sucks,But shortages with take center stage,And Ford will keep us the hook not to...
I have similar circumstances, day one order,Build date May,Built 7/22 yes vin window sticker and email it is built,said needs top upgrade,so they got the tops you think they finish it and not build any more to sit outside, do not start what can not finish.
I HAVE SIMILAR Thoughts,my truck has been built since 7-22-21,I saw the list on dirt hill it has not changed,I thought this week they would(catch up) release vehicles as required,why stat other rigs when there is a parts shortage???mine need a top.same with about six hundred others that I know...
I live in SC EXIT 1 Just below you we should talk ,I also are doing similar mods.we should talk.My county # is 8647616529 my name is listed Alan Black Diamond 2.7 already bought tire and rims and tail pipe awaiting delivery to remove seats ect.
The old question asked again, can i fit on a Non SQUATCH Black Diamond 285/70 r17 using a 17 inch 35 positive offset without rubbing or removing or modifying front coils. any pictures of the look.
So I am reading about all the dates of production coming soon,l What about all the vehicles sitting on dirt hill, awaiting something,engine chip,Mic Top,the post from Ford they will not start any more broncos until all the other half built rigs or FE Are finished,so the Big questions are they...
so also mic top production 7/22 still in production vin number window sticker for over four weeks now. black Diamond no sasquatch 2.7 buddy has loaded Bad Lands stuck in production 6 weeks, my vin ends 181