Dealer ETAs likely never change since our status never changes. They told me this morning that mine was for 7/9. They usually estimate 14-21 days to get to Florida. The ETA is given based on when the Bronco ends production (when they put the date next to the Production tab). Until the status...
Hi everyone. I’m taking over an order that was scheduled for this week. I’m starting to have flashbacks to 2 years ago for my first Bronco…. It stayed In Production for over 4 months. I hope we all get out sooner than that.
To everyone that had a tracker revert backwards- this is a system glitch. The tracker is far from perfect. You way I’ll have the dates listed by the steps. You all are fine. It does this.
You will enter Production 1 week prior to your build date. If you are scheduled for next week, but not until Thursday or Friday, you’ll have your Window Sticker and enter production by the end of this week.
2 black mounting brackets- plus bolts.
2 small rear hinges- plus bolts
Right and left upper roll bar mounts- plus bolts
Right and left C-pillar trims- use existing bolts
Trim inside cargo area- no bolts needed, unless you plan on cutting the existing trim pieces.
Part numbers- I’ll have to...
I’m at 28k. The miles were climbing fast so I got a different daily driver. 2023 Maverick Hybrid BAP XLT.
Koopa and Bowser. Koop already has 6k since Jan 31.