A bunch of Dirt Mountain detainees arriving at Granger this morning. Thanks for the pict @Catmandu . Mine is the one collecting the bugs on top in the very front.
For a brief time last night, my status was updated to Delivered. It now has just updated my ETA Start and End Dates to 10/31 and 11/6 but still says ‘In Transit.’ Hoping this means it’s on a truck 🤞🤞
When I went to OffRodeo in Moab, I was in a Wildtrak, and I must say I was jealous of those driving the Badlands when I saw how much smoother they went over the rutted roads and rocks with that sway bar disconnected. Made me glad I ordered a Badlands
When we took the roofs off at off-rodeo, the panels had to come off and back on in a certain order. They may have done it backwards and messed up the seal between.
All the info is on the B6G Trackers link. For Rail, it is automated phone prompts:
https://www.bronco6g.com/forum/threads/here-are-the-bronco-build-tracking-links.22795/