From what Iāve read, once you have a ātear tagā ( on the top of the modules page) your Bronco is complete and ready to ship unless thereās a part or mechanical constraint. Someone else may chime in with more info.
I feel like you and I are gonna be the first few ā24 broncos on this site. Iām...
Iām waiting on my Everglades to get here too. Iām 100% anti-graphics on vehicles. I just hate to pull those off because theyāre about 8-900 ea to replace for whatever reason
That has to be whatās happening. I got the same email and my broncoās modules have populated and tear tag produced. From everything Iāve read that means the Bronco is built.
My Everglades is being built! The modules are populating on the motorcraft āas-builtā module site. Still shows in production on the ford tracker but it now shows updated 01/02, which was my blend date. Nervously waiting for my tracker to show BUILT.
Well, itās happening. My blend date was scheduled 01/02/24. The Ford tracker still shows āin productionā this morning but the info at the bottom says last updated 01/02.
Secondly, all my modules populate on the mororcraftservice āas builtā module tracker.
Iām hoping my status goes to BUILT...
Unless a miracle happens, your ā23 probably wonāt be built. You would have heard from your dealer by now. All ā23s were built by 12/22/23. Ford canceled all unscheduled ā23s the first week of December and even cancelled some that WERE scheduled with VINs.
No one has really found the āmagic recipeā for ordering.Big dealers have a bigger allotment usually but youāll be way behind on their order list. Smaller dealers tend to have smaller allotments. That said, I ordered from a friend who owns a TINY ford dealership. (6-10 new vehicles on the lot)...
If you have a VIN you can get your window sticker and see your blend date.
paste your VIN to the end of this link:
https://www.windowsticker.forddirect.com/windowsticker.pdf?vin=
Shadow black Everglades. Iām not sure why no one orders that trim. I guess the 2.3 only, snorkel and gaudy decals drive some away but you canāt build a BB or BD with the same options, cheaper.
Sasquatch, hard top, LED headlights, full skid plates, rock rails, roof rack, winch, modular bumper...
Have you checked the tracker since Friday? Seems like a few of us have move into production status. I have a blend date (body and chassis are joined) of 01/02. Was initially scheduled to move to production the week of 01/01/24
Haha me too. Iām hoping the better pay and Christmas break of no scheduling has the employees refreshed and ready to go. I am assuming that since weāre scheduled earlier than predicted, things are running smoothly. No plant retooling with a body change or anything and being the 4th model year...
I put my order in 8/16 as soon as banks opened around 3p central time.
looks like Iām number 371 of the first batch if Iām reading the window sticker correctly