So your dealer was holding out on telling you this info too? My dealer seems pretty small so probably not a ton of allocations but I was one of the first 3/27 orders placed so I’m hoping I’m good. They still won’t tell me any allocation details though
What makes the 2 door a constraint then? I was under the impression it was because of the hard top. That’s the only thing that makes sense since the hard top for 4 door is also a constraint
Yeah but the 2 door is still a huge constraint because of the hardtop. It was supposed to be hard to get one built by the end of the year along with Sasquatch and 4door hardtop, but the past couple weeks of scheduling have shown the opposite
Let me guess, you either have a BD with 2door, Sasquatch, hardtop, or all of the above. Seems to be the only ones getting scheduled strangely enough, thought there was supposed to be a shortage of those options
Either you’re very unlucky or your dealership doesn’t have many allocations cause a lot of new orders with Sasquatch and hardtops were scheduled. I have a feeling they are scheduling as many orders with constrained items as they can, and when they run out of tops they will start scheduling soft...
Seems to be all hardtops still. My build is similar to yours, BD non SAS soft top 2.3, auto, mid pkg, mod bumper. Hopefully they run out of hardtops soon and start building BD with soft tops but who knows lmao
How do you order through the Ford website? I thought you could only order through a dealer. Ford chat have me the same answer when I asked that but it doesn’t make sense. It shouldn’t be that hard to link your order with your ford account
I have a feeling Ford is scheduling the constraint orders early after seeing so many Sasquatch, hardtop, wildtrak type orders on these scheduling threads. Once they reach the limit of the availability of those constrained items, they will move to the less constrained orders. Everyone else who...
I got the same response when asking my dealer about allocations. I’m not sure if they just don’t know as much as I do about the whole process or if they are hiding something.
If I changed my order to add SAS and hardtop with my luck they would start scheduling BD non-SAS soft tops. $2k now for the factory tops and additional $6k for SAS, I think I’ll settle for takeoffs to save some money. My order was placed in NJ with a dealer who won’t give me allocation info, so...
I have a March 27 order for a BD 4dr 2.3 soft top non-sas, but not scheduled yet. I am also looking for SAS takeoffs and 2" lift since I thought adding SAS and hardtop would take longer to get a build date, but now that is what is getting built. Anyway, good luck and let me know what type of...
Wait so you placed your order on 3/27 this year and almost got scheduled? That’s the first 3/27 order I’ve heard get scheduled, and the fact that it’s a wild track with Lux is wild
where did you hear it was only 30k? This is new info to me. I hope it’s true because I’m a 3/27 order for a BD non Sasquatch soft top. I think I have a good chance of getting built if this is true