Just edited my info for my new EDD of 4/6. Vehicle was produced on 12/14 and is awaiting a chip for who knows what according to ford. I do not know if this date is a cya (cover your ass) because they do not actually know when they will receive the module that the chip is missing from or it is...
Hello 12/6ers, my 2dr OBX has been in production since it was produced on the 14th of Dec. It is, according to the vehicle report, waiting for a chip. I have the lux package so I am wondering if it is the digital temp control knobs that are no longer on the 22 Broncos. Wonder why they cannot...
Just got off the phone with my dealer and the vehicle report for my vehicle has it now on hold for a microchip. Must be the digital temp readout on the climate system since the 22's no longer have that option on theirs. Guess my EDD of 2/5 is out the window and a more realistic date would be...
I am thinking if I see my Bronco by spring I will be lucky. It was a 12/6 build week with an actual final build of 12/14 as per my dealer. I looked over his shoulder as he got into the system to look at by build. It is now 5 weeks later and nothing from Ford. My vin is in the United Roads...
With no information from Ford since my vehicle was built on 12/14 my vin popped up on the United Road delivery site today with a load number. I guess that means it is either on its way to Twin Oaks depot by train or at least in the system for shippment. Dealer still has no info on this.
Just checked the tracker and the date on the bottom of my WS changed to today's date and my new edd is 2/5 from the previous date of 1/6. Has been built since the 14th of last month and sitting at MAP. OBX, AMB, lux., SAS. Maybe I should not have ordered floor mats.
Talked to my dealer this afternoon and my OBX is still at MAP. Has been built since 12/14 but sitting at the factory. Trackers still say in production so I guess my EDD of 1/6 is not going to happen since it is being shipped by rail to either Twin Oaks or Wilmington before being trucked to my...
Just returned from my dealer, my vehicle has been built as of the 14th and is at the factory. My original blend date was the 10th so they must have been behind a few days. He said it could be just waiting for transportation by rail to Wilmington.
Just added my info the spreadsheet, got my ws this morning and blend is next Friday. Talked to my dealer and ETA to south jersey is 12/27 if all goes as planned.
I reserved a 2dr OBX on the morning of 7/15 and ordered on Feb 12th. My dealer had 17 allocations and has not received any Broncos outside of their demo yet. Their number 1 customer has a built vehicle but it must be at dirt mountain awaiting a roof. After getting the August email that I was...
To clarify my last reply I reserved my 2dr. OBX with SAS LUX and leather on the morning of July15 of last year. Placed an order with 1k deposit in Feb of 21 and resigned to the fact that with all of the sins on my order and the email that I had been bumped to 22 that I was not expecting todays...
Just got home from shopping and checked my email. Low and behold an email from Ford on my OBX 2dr Bronco. Scheduled for week of 12/6 with vin. My luck, just snagged a Bronco Sport Badlands yesterday from a customer who got tired of waiting for it. Love how it drives but just called my dealer...
Forced to change color since I am a sinner by ordering a 2dr Sas Bronco in Feb of this year. Was an AMB Bronc from the start as I reserved 36 hours after they opened on the morning of the 15th. Now that I have to choose a new color I have decided on Carb Grey. Like the look with the MIC top...
Reserved a Bronco on 7/15 and ordered mine today. I am #10 out of the 17 allocated to my dealership with only 4 of the people ahead of me placing an order so far. Several of the others ahead of me have not been heard from yet. Hopefully I can move up the list.