Congrats! MIC or soft top?![]()
Finally, blend date 08/13/21. Almost 4 weeks after production. Hang in there y’all.
Sponsored
Congrats! MIC or soft top?![]()
Finally, blend date 08/13/21. Almost 4 weeks after production. Hang in there y’all.
Hardtop?![]()
Finally, blend date 08/13/21. Almost 4 weeks after production. Hang in there y’all.
Soft topCongrats! MIC or soft top?
I hope 10-2 to 10-8 delivery happens for ya, prepare yourself for delivery date delays as well (I've had two so far). It's a real thing, I am 30 days from the built email and still no Bronco at Granger.Finally got my built email as well. Should be at Granger between 10/2-10/8. Hallelujah.
I felt like this now that it’s my delivery week I am so excited I can hardly stand it. Probably just needs time to sink it it really is happening.yup! Got email at 7:00 on Saturday night. Built!
8/9 blend date. Soft top.
Looks like whatever was the problem, they fixed a bunch this week.
It's funny the email has a link to the tracker, but the tracker is not yet updated; still says in prod.
![]()
I have to say, I am a lot less excited than I thought I would be. Maybe it is the repeated kicks to the balls. Maybe it just has to sink in.
yeah I hear ya. My build week was moved, then my build date was pushed back, then it sat “in production” for almost a month. Need rain to think it’ll hit this estimate, but it is getting closer.I hope 10-2 to 10-8 delivery happens for ya, prepare yourself for delivery date delays as well (I've had two so far). It's a real thing, I am 30 days from the built email and still no Bronco at Granger.
Right on!!! It's exciting for sure!!! Good luck to you!!!yeah I hear ya. My build week was moved, then my build date was pushed back, then it sat “in production” for almost a month. Need rain to think it’ll hit this estimate, but it is getting closer.
Mine was built on 8/9 and sat with no updates until last week… a batch of soft tops got flagged for presumably QC (a guess) and are slowly starting to be released… it will happen soon…According to my Dealer, my bronco was "built" 34 days ago. My pizza tracker says something similar. Anyone else dealing with at 34 day build time?
Two Utah guys with same delivery week at Granger. What are the odds. Congrats! Maybe I’ll see you there.Finally got my built email as well. Should be at Granger between 10/2-10/8. Hallelujah.