IKR.At least you have a build date.
Shocking a stamping plant sent bad parts to an assembly plant.If it's a 2 door, @PREMiERdrum just said the floor pans are being delivered to the plant damaged and have to be repaired.
He said damage is from transport.Shocking a stamping plant sent bad parts to an assembly plant.
Bronco help line was useless. He said, " I see you ordered your bronco on oct 3, 2021..."
umm no...October 3rd hasnt happened yet. in the us, 3/10 is march 3rd not october 10th.
Had to call the dealer and he confirmed they moved my date to 7/12 on 6/12, although i havent seen an. email update yet.
The damage is apparently happening during transport, they're good leaving the factory.Shocking a stamping plant sent bad parts to an assembly plant.
Sounds like this is your first build change, correct? There was a big first wave of changes a couple weeks ago but now 2 door orders are supposedly being pushed back for a 3rd time.Bronco help line was useless. He said, " I see you ordered your bronco on oct 3, 2021..."
umm no...October 3rd hasnt happened yet. in the us, 3/10 is march 3rd not october 10th.
Had to call the dealer and he confirmed they moved my date to 7/12 on 6/12, although i havent seen an. email update yet.
Brutal.If it's a 2 door, @PREMiERdrum just said the floor pans are being delivered to the plant damaged and have to be repaired.
Let me guess 1) Trailer was not airride. 2) Parts weren’t locked in correctly 3) Details on the racks are not designed correctlyThe damage is apparently happening during transport, they're good leaving the factory.
Door #3.Let me guess 1) Trailer was not airride. 2) Parts weren’t locked in correctly 3) Details on the racks are not designed correctly
I’ve been on the receiving end of way too much bad sheet metal.
And people wonder on this forum why launches take so long………..Door #3.