Some super rough estimate inaccurate Google search math for fun:
3000 Ford & Lincoln dealerships in the US
1100 Lincoln dealerships
= 1900 Ford dealerships
7 months of build time allowing for delivery in 2021
Low estimate of 500 built a day, 6 days a week
That's 84,000 Broncos built and delivered in 2021 (assuming that many reservations are actually converted to orders)
84,000 divided by 1900 dealerships = 44 Broncos per dealership IF allocation was equal at every dealership.
Allocation won't be equal but this math kinda makes it seem like a single dealership wouldn't get more than maybe 300 to 500 allocations.
Basically, good luck and may the force be with you to those at Granger.
3000 Ford & Lincoln dealerships in the US
1100 Lincoln dealerships
= 1900 Ford dealerships
7 months of build time allowing for delivery in 2021
Low estimate of 500 built a day, 6 days a week
That's 84,000 Broncos built and delivered in 2021 (assuming that many reservations are actually converted to orders)
84,000 divided by 1900 dealerships = 44 Broncos per dealership IF allocation was equal at every dealership.
Allocation won't be equal but this math kinda makes it seem like a single dealership wouldn't get more than maybe 300 to 500 allocations.
Basically, good luck and may the force be with you to those at Granger.
Sponsored
Last edited: