Ditto. That's a pisser.I was built 4/13 and estimated delivery on the back door page now is 5/6-5/12.
Sponsored
Ditto. That's a pisser.I was built 4/13 and estimated delivery on the back door page now is 5/6-5/12.
I changed to 5/6-5/12 as well. Same.Called Ford Customer Service.
John,If I don't grade on a curve, I would say the overall "average" is around 1 month from build to delivery. Based on 2023 only, and if nothing happens between now and the end of 2023 deliveries, probably around two weeks or so.
/john
John,
I know you have asked us to wait on our travel plans until you give us the okay. But, I need a 2-week+ lead time for my travel plans. So, I am wondering if your estimate still fits the current cycle of build-ship-dealer final prep-deliver to customer?
I cringe at the thought of my Bronco sitting in your lot for several weeks after you are done with it.
For example, I was built 4/13 and show an "Estimated Delivery 5/6/2023 - 5/12/2023." I assume this means when the truck delivers my Bronco at your lot.
Ball park: When could I reasonable expect to take delivery? (No penalty if your guess is off.)
Thanks John
Okay, okay!See, that's the problem, I can't venture a guess because the arrival dates to the dealership are so varied, if I guess, it's going to either be dead on or way off. That's why I ask everyone to hold off on travel plans. We don't control the deliveries, but we can try to get folks to wait it out until it actually arrives and passes our service department inspection. We've had Broncos built and sat at MAPS for literally months before they've arrived here. We've also had them built and delivered the next day.
When the plant produces more, it puts a further strain on transportation and backs things up even further.
/john
I also just noticed that I now have a tear tag. Not sure if I am already on a convoy and shipped status has not been updated. Who knows?Seems like delivery estimates are all over the place. I had a 4/14 blend date originally showing delivery 21st -27th. Now back door shows 4/17 to 4/23
A what?I also just noticed that I now have a tear tag. Not sure if I am already on a convoy and shipped status has not been updated. Who knows?
If you go here https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/AsBuiltA what?
Okay, I did that, but I don't get what it means.If you go here https://www.motorcraftservice.com/Home/SetCountry?returnUrl=/AsBuilt
and enter your vin, it will populate with all of your modules as your bronco is built. Once it is finished, you are supposed to get a tear out tag. My modules populated the night of the 14th (blend date), but I did not get a rear tag until today.![]()
The magic question. Here is a thread with some more info https://www.bronco6g.com/forum/thre...ed-emails-delivery-date-estimates-more.24987/Okay, I did that, but I don't get what it means.
Oh yay! So since I have a tear tag code/number that means my Bronco isn't sitting in some purgatory waiting for a chip or whatnot?The magic question. Here is a thread with some more info https://www.bronco6g.com/forum/thre...ed-emails-delivery-date-estimates-more.24987/
my impression is that once you have the tear tag you are awaiting shipment. The bronco is done at this point. I have heard of instances where folks have gotten their broncos before their shipped email.
Now est delivery is back to 4/18 -4/24 and says it is shipped. I’ll believe it when I get notified by John that it’s at SAC.4/11 built date with a 5/6 - 5/12 est delivery date.