Sponsored

6/20/22 Build Week Group

Bronco_Skillz

Outer Banks
Well-Known Member
Joined
Feb 21, 2022
Threads
0
Messages
206
Reaction score
236
Location
CT
Vehicle(s)
BMW X3
Your Bronco Model
Outer Banks
Clubs
 
Hopefully the shipping department is going to work during the shutdown. Would hate to get built and then sit a month:mad:
Someone posted this link on the No scheduling 6/13 thread
https://thebronconation.com/forums/threads/map-shutdown-7-4-7-24.12461/

There are rumors on on that link I shared, that they're going to use the shutdown time to unpack the mountain. If they're moving broncos off the mountain, I speculate that shipping will still be processing.
Sponsored

 

luvtofish

Badlands
Well-Known Member
First Name
Dan
Joined
May 14, 2020
Threads
14
Messages
245
Reaction score
384
Location
Kansas City Area
Vehicle(s)
2012 King Ranch F150 Supercrew.
Your Bronco Model
Badlands
Clubs
 
For those that got a sticker this morning, do you know your actual build day? All I know is that I'm build week of 6/20. Checking with chat to see if they know a specific day.
 

mgp1

Everglades
Well-Known Member
First Name
Megan
Joined
Apr 13, 2022
Threads
6
Messages
519
Reaction score
525
Location
Georgia
Vehicle(s)
2024 Bronco
Your Bronco Model
Everglades
Got my sticker today!!! next I am doing my daily ritual of ford chat to make sure build date stays as the 21st!
If you have your window sticker, your blend date is set in stone.
 

luvtofish

Badlands
Well-Known Member
First Name
Dan
Joined
May 14, 2020
Threads
14
Messages
245
Reaction score
384
Location
Kansas City Area
Vehicle(s)
2012 King Ranch F150 Supercrew.
Your Bronco Model
Badlands
Clubs
 
I'm trying to do the Ford Chat. I've been stalled at 10 min 54 sec wait time for 20 minutes.

Update: Was told my build day is 6/25. That's a Saturday???
 
Last edited:

Sponsored

mgp1

Everglades
Well-Known Member
First Name
Megan
Joined
Apr 13, 2022
Threads
6
Messages
519
Reaction score
525
Location
Georgia
Vehicle(s)
2024 Bronco
Your Bronco Model
Everglades
I'm trying to do the Ford Chat. I've been stalled at 10 min 54 sec wait time for 20 minutes.

Update: Was told my build day is 6/25. That's a Saturday???
From what I understand, they build on Saturdays.
 

luvtofish

Badlands
Well-Known Member
First Name
Dan
Joined
May 14, 2020
Threads
14
Messages
245
Reaction score
384
Location
Kansas City Area
Vehicle(s)
2012 King Ranch F150 Supercrew.
Your Bronco Model
Badlands
Clubs
 
all those line workers thinking, "this is Saturday, I'd rather be fishing than wrenching on this bronco". LMAO
 

Sponsored

mgp1

Everglades
Well-Known Member
First Name
Megan
Joined
Apr 13, 2022
Threads
6
Messages
519
Reaction score
525
Location
Georgia
Vehicle(s)
2024 Bronco
Your Bronco Model
Everglades

Compta38

Badlands
Well-Known Member
Joined
Jul 20, 2020
Threads
10
Messages
3,736
Reaction score
11,506
Location
Alabama
Vehicle(s)
Ford Fusion
Your Bronco Model
Badlands
I'm trying to do the Ford Chat. I've been stalled at 10 min 54 sec wait time for 20 minutes.

Update: Was told my build day is 6/25. That's a Saturday???
I've seen a couple people have their Saturday build moved a day or two back as in 6/23-24.

I was stalled with chat earlier at 3m20s for like 15 minutes.
 

Trigger

Black Diamond
Well-Known Member
Joined
Aug 1, 2020
Threads
1
Messages
269
Reaction score
612
Location
Kansas
Vehicle(s)
2004 Silverado/2022 Black Diamond
Your Bronco Model
Black Diamond
Clubs
 
Bumped a couple days from Monday to Wednesday per chat. Just glad to keep the build week. Guess I’ll quit looking for a WS every hour today. :cool:
 

mgp1

Everglades
Well-Known Member
First Name
Megan
Joined
Apr 13, 2022
Threads
6
Messages
519
Reaction score
525
Location
Georgia
Vehicle(s)
2024 Bronco
Your Bronco Model
Everglades
I've seen a couple people have their Saturday build moved a day or two back as in 6/23-24.

I was stalled with chat earlier at 3m20s for like 15 minutes.
Are you still on for Saturday 6/28? I have been bounced 6/20 - 6/24 - 6/22 - 6/24 and I'm STRESSED.
Sponsored

 
 





Top