3/27 order for a two door OBX 2.7 Black with SAS.
The original production email was 6/1 with a 7/24 production week.
The tracker updated at some point to a 7/27 build date.
The last update on the tracker was 6/23 and I'm back to 7/24. build week.
Never mind. Just checked, I'm in production.