Sponsored

Search results

  1. 7/24/23 Build Week

    Thanks for the URL. That worked for me also. 7/24 Blend 454/540 down the line.
  2. 7/24/23 Build Week

    3/27 order for a two door OBX 2.7 Black with SAS. The original production email was 6/1 with a 7/24 production week. The tracker updated at some point to a 7/27 build date. The last update on the tracker was 6/23 and I'm back to 7/24. build week. Never mind. Just checked, I'm in production.


Top