Sponsored

Recent content by siddie

  1. Texas [SOLD] Inspired Overland Standard Lightweight Rooftop Tent - Austin Area

    Inspired Overland Standard Lightweight Rooftop Tent. Sleeps 1 or 2. Previously Installed on 2 Door Ford Bronco. No trades, please. Asking $700.00. Local Pickup, Austin Area. Details: WEIGHT: 76lbs DIMENSIONS CLOSED: 82in L x 50in W x 6in H (Including Mounting Crossbar) DIMENSIONS OPENED...
  2. Win an ARB Portable Compressor this Holiday Season

    Don’t I need this badly! ā˜ŗļø
  3. Exitrax Recovery Board Group Buy and Give-a-way!

    Thanks. I am looking to get 930 boards along with the mounting brackets and leash.
  4. Exitrax Recovery Board Group Buy and Give-a-way!

    are you still running the discounts?
  5. 5/2/22 Build Week Group

    Im sitting next to you too. Still in production with no updates. Dealer said still on track for delivery anytime between 5/31 to 6/6. Lol sure. Surprise me Ford!
  6. 5/2/22 Build Week Group

    My tracker is still in Production with no built email. Called and checked chat: Same answer - in Production, to be delivered between 5/30 to 6/6. Considering I’m in Texas I don’t think that’s gonna happen. I might be the unlucky one. The wait continues. šŸ¤ŸšŸ¼
  7. 5/2/22 Build Week Group

    I'm in same boat. Pizza Tracker still says in Production, although my blend date was 5/4. I have mods and tear tag populated for a few days now. Checked with Ford chat today, I was told that my shipment is targeted to be completed by 6/6. I did see that my ford pass app pop with an...
  8. 5/2/22 Build Week Group

    Got it. Thanks. Il just wait and watch then.
  9. 5/2/22 Build Week Group

    Blend 5/4 although Pizza Tracker has the production date at 5/5 current status: in Production - Mods and Tear Tag populated. No movement in Pizza Tracker or No sign of built email. Considering it’s weekend, I wouldn’t except any movement until Monday or Tuesday. I’m wondering if my only mod-...
  10. 5/2/22 Build Week Group

    Modules popped. Updated tracker! blend : 5/4
  11. 5/2/22 Build Week Group

    Just checked, I don’t see the mods yet. Will update the thread/Spreadsheet later in the day or tomorrow morning. I’m 5/4 blend date. Also, I don’t think heather is on 5/4 date, she must be 5/5. As the place in line numbers don’t match.
  12. 5/2/22 Build Week Group

    5/4 build - Changed to In Production this noon. And now I have a WS! Finally.
  13. 5/2/22 Build Week Group

    I’m in your build date as well. My tracker just moved to in production. No WS yet.


Top