Here is my manual break out since some are wondering.....
Orders on 99 that will NOT be counted nor built and possibly deleted soon. Yes, I have tried reaching out to them.
5 two door builds and 8 four door builds with 1 customer coming in today at 3 to finalize their 99 conversion
Dirt Mountain update.....
2 four doors and 1 two door are still stuck and being "held" my guess is chips
There are an additional 2 four doors that were "held" that now show "at plant"
Assigned build dates
We have 1 four door and 1 two door with dates
At the plant
4 four doors and 1 two door
Remaining Broncos
We have 12 two door builds and 19 four door builds along with 2 Raptors one of which is spoken for and the other is up for grabs with a 20k addendum and these do NOT affect current allocations.
As a side note Ford requires an 80% delivery to not hurt allocation and we are currently at 100% Bronco to customer.
I have a disclaimer that I am counting these manually so I could be off on my numbers but if so not by a lot.
Orders on 99 that will NOT be counted nor built and possibly deleted soon. Yes, I have tried reaching out to them.
5 two door builds and 8 four door builds with 1 customer coming in today at 3 to finalize their 99 conversion
Dirt Mountain update.....
2 four doors and 1 two door are still stuck and being "held" my guess is chips
There are an additional 2 four doors that were "held" that now show "at plant"
Assigned build dates
We have 1 four door and 1 two door with dates
At the plant
4 four doors and 1 two door
Remaining Broncos
We have 12 two door builds and 19 four door builds along with 2 Raptors one of which is spoken for and the other is up for grabs with a 20k addendum and these do NOT affect current allocations.
As a side note Ford requires an 80% delivery to not hurt allocation and we are currently at 100% Bronco to customer.
I have a disclaimer that I am counting these manually so I could be off on my numbers but if so not by a lot.
Show full message↓