I’m 14 ahead of you @ 612!![]()
626/869 place in line going on rail to cali so prolly 3-4 weeks after its built im assuming from
all the post i been reading
Sponsored
I’m 14 ahead of you @ 612!![]()
626/869 place in line going on rail to cali so prolly 3-4 weeks after its built im assuming from
all the post i been reading
Me too: Says "In Production - build week 4/12". The build week is actually 4/10, so build date should be 4/12Just got moved up to 4/12 and in production. No window sticker yet.